Project Description
Electromechanical works for the construction of the new port – Link road from Limassol port -Highway, Phase I, part A. The works include the design and construction of a drainage pumping station, supply, installation, testing, commissioning of drainage penstocks 1800x2100mm with 2 bar pressure capacity inside the box culvert for drainage management purposes, the supply, installation, testing, commissioning of by-pass oil separators maximum capacity 3.75 m3/s for the treatment of the first flush collected from the main link road.
Completed
2012
Client
Medcon Construction Ltd
Location
Limassol
Value / Capacity
Drainage Pumping Station: 300 l/s
Oil separator: 3,750 l/s