Project Description
Electromechanical works for the construction of the new port – Link road from Limassol port -Highway, Phase I, part C. The works include the design, installation, testing, commissioning of mechanical screens, by-pass oil separators, penstocks, flap valves, ultrasonic flowmeters and associated works in a by-pass lake structure that receives drainage water from the main link road box culvert.
Completed
2016
Client
Nemesis Construction Ltd
Location
Limassol
Value / Capacity
Mechanical screens: 2,000 l/s
Oil separator: 3,750 l/s